Skip to content
MOBILE HOME
LOGISTIC
Plan your transport

MOBILE HOME LOGISTIC / CORRIDOR GUIDE

Static caravan transport from the Netherlands to France

Static caravan transport from the Netherlands to France. Assess dimensions, collection, transport options and final delivery; ports and timing are confirmed for each move.

What MHL organises on this route

  • MHL organises collection at origin (Netherlands) and road transport.
  • MHL organises the sea crossing.
  • MHL delivers to the plot and sets the home down on its supports.
  • Levelling and water, power and sewage connections are the owner’s responsibility.

The written quotation states what is included and what is excluded.

Contact MHL: +351 937 369 173 · mobilehomelogistic.info@gmail.com

Estimate your transport cost

Enter the value of your mobile home, the origin and the destination. Insurance and import taxes depend on that value.

Origin or destination not listed? MHL organises transport on any route worldwide: request a quote with the form.

Plan the journey from collection to delivery

A static caravan collected from a Dutch park needs vehicle access and exit permission. Identify the park representative and anything still requiring disconnection or removal before loading.

A road option also assesses transit countries. For delivery to French parks, coordinate timing with the local team and confirm whether unloading or placement is needed; siting and use of the mobile home have their own requirements.

Ports considered in the assessment: Rotterdam Europoort at origin and Le Havre at destination. They are options subject to cargo acceptance, equipment and available connections, including any intermediate calls. The proposal identifies the selected terminals; this list guarantees neither direct sailings nor capacity for every unit.

Send length, width, total height and weight, chassis and exterior photographs, collection and delivery addresses and access images. Identify twin sections, obstacles and unloading or placement needs. Trailer, crane and permissions are assessed for the actual load.

The quote should combine the journey stages and identify inclusions and exclusions: loading, freight, handling, storage, documents, insurance and delivery where applicable. Timing is confirmed after technical assessment and availability checks. Permission to site or use the home is checked separately with the competent authority.

Two trucks on rain-wet ground: one with an abnormal load sign and a crane truck beside a mobile home

Ports considered during planning

Rotterdam Europoort → Le Havre. These are planning references, not confirmed direct sailings. Cargo acceptance, terminal handling and the inland route must be checked for each shipment.

What to send for a transport quotation

Prepare your move

Other corridors

Prepared by: Mobile Home Logistic · Content reviewed: