Skip to content
MOBILE HOME
LOGISTIC
Plan your transport

MOBILE HOME LOGISTIC / PRACTICAL GUIDE

Ro-Ro mobile home transport: process and preparation

How to prepare a mobile home for Ro-Ro: support equipment, vessel acceptance, lashing, handling and collection and delivery stages.

Ro-Ro, or Roll-On/Roll-Off, moves cargo through a ship’s ramp on suitable wheeled equipment. A mobile home may need a trailer or support platform; wheels on its chassis alone do not establish suitability for boarding.

Assessment starts with length, width, total height and weight, including support equipment. The operator and terminal confirm whether the load fits the proposed voyage’s limits and how it will be manoeuvred, supported and secured.

The plan combines collection, terminal entry, boarding, sea freight, disembarkation and final delivery. It should identify responsibility and equipment for each stage; services do not all carry the same vehicle or offer the same deck conditions.

Lashing and support points must respect the unit’s structure and the operator-accepted plan. Chassis photographs and manufacturer instructions help prepare assessment. Existing damage should be recorded before collection.

Compare Ro-Ro with alternatives using the complete journey cost, including road legs, handling and unloading. There is no universal saving or transit time: suitability depends on the load, access and confirmed availability.

Mobile home on a trailer in the stern opening of a ro-ro ship, seen from the loading ramp

This guide explains planning considerations. The transport plan, carrier acceptance and applicable requirements need confirmation for your unit and destination before booking.

Frequently asked questions

Can every mobile home travel by Ro-Ro?

No. The unit and its support equipment must meet the operator’s and terminal’s acceptance requirements. Provide actual external dimensions, weight and chassis photographs before selecting a voyage.

Is Ro-Ro always cheaper than road transport?

No universal comparison applies. Compare like-for-like quotes including collection, handling, any sea freight, road legs, documents and unloading.

Does a sea freight quote include site delivery?

Only if it is expressly included. Ask the quote to identify the final address, unloading or placement work and any excluded charges.

What to send for a transport quotation

Ask the MHL team

Moving a static caravan in the UK ↗

Related guides

Explore transport corridors

Prepared by: Mobile Home Logistic · Content reviewed: